Connect with us

Economy

Federal Government Inaugurates N18.8bn Water Project In Benue

Published

on

Tap water

Federal Government Inaugurates N18.8bn Water Project In Benue

Federal government inaugurates N18.8bn water project in Benue. He noted that the project would improve the lives of an estimated 506,000 residents by providing access to potable water.

President Bola Tinubu on Thursday inaugurated the upgrade of the Buruku-Gboko water supply project, valued at ₦18.8 billion.

The project, located in Ameladu, Gboko Local Government Area of Benue State, is a major underground water collection site in the region.

The project, originally conceived in 1992 by former President Ibrahim Babangida to provide clean and safe drinking water to Gboko, Buruku, and environs, was neglected by successive administrations.

Speaking at the groundbreaking ceremony, Mr Tinubu, represented by the minister for water resources and sanitation, Joseph Utsev, said the project aligned with his administration’s Renewed Hope Agenda.

“The project is a clear demonstration of the government’s commitment to improving the lives of our citizens, which aligns with President Bola Tinubu’s Renewed Hope Agenda of providing one of the most essential necessities to the populace.

“The Buruku/Gboko Water Supply Project was initially conceived as the ‘Gboko-Yandev Water Supply System’ but has now been renamed the ‘Rehabilitation and Upgrading of Buruku/Gboko Water Supply Project,” Mr Utsev explained.

The minister stated that the rehabilitation and upgrade of the Buruku/Gboko Water Supply Scheme aimed to restore the vandalised waterworks at Ameladu, Mkar in Gboko, and the Buruku Water Supply Scheme.

He noted that the project would improve the lives of an estimated 506,000 residents by providing access to potable water and reducing the risk of waterborne diseases.

Mr Utsev explained that water would be sourced from the Katsina Ala River via an intake structure on the riverbank.

It would then be transported over a distance of 17 kilometres for purification and treatment before being distributed as potable water to Gboko, Mkar, and neighbouring communities.

He disclosed that the project would be executed by Messrs Ceylon Construction Services Limited at a cost of N18.8 billion, inclusive of all relevant taxes, with a completion timeline of 18 months.

“The scope of work includes the complete rehabilitation of the water intake and treatment plant at Gboko and the supply and installation of three low- and high-lift pumps with a motor power rating of 400V/50Hz.

“It has a discharge capacity of 380–440 m³/h at a head of 18–22 metres, along with an associated control panel adaptable to a solar power source using an RSI Hybrid 30KW VFD inverter.

“Other works at Buruku include the supply and installation of a 150m³/hr package water treatment plant with associated electromechanical equipment at Buruku station,” Mr Utsev added.

He urged the Benue government to provide the necessary support to the team of engineers and experts handling the project to ensure its successful completion.

Tap water

Tap water

In his remarks, Benue Governor Hyacinth Alia commended Mr Tinubu for fulfilling his campaign promise to address the people’s long-standing challenge of accessing safe drinking water.

Represented by his deputy, Samuel Odeh, Mr Alia described the project as monumental, noting that it had been abandoned for decades.

He urged residents to take ownership of the project and ensure its sustainability.
“The project belongs to the people of Benue. I appeal to you not to harass the contractors so they can complete the work on time,” Mr Alia said.

Also speaking, the paramount ruler of the Tiv nation, the Tor Tiv, His Royal Majesty James Ayatse, assured that the community would take full ownership of the project and protect it.

Economy

Osun APC Chieftain Begs Tinubu To Intervene In Contributory Pensioners’ Plights

Published

on

By

APC

Osun APC Chieftain Begs Tinubu To Intervene In Contributory Pensioners’ Plights

Osun APC chieftain begs Tinubu to intervene in contributory pensioners’ plights. The politician said that many pensioners were paid 50 per cent and 25 per cent lump sum.

Achieftain of the All Progressives Congress (APC) in Osun State, Olatunbosun Oyintiloye has appealed to President Bola Tinubu to look into the plights of contributory pensioners in the country.

Mr Oyintiloye, a member of the defunct APC Presidential Campaign Council, made the appeal while speaking with journalists on Tuesday in Osogbo.

The APC chieftain said that delayed, non-payment of pensions, inadequate funding and corruption within the pension scheme led to hardship and financial stress for pensioners.

Mr Oyintiloye, a former lawmaker, said that since 2004, when the Pensions Reform Act(PRA 2004) on the contributory pension scheme was introduced by the Federal Government, the pensioner had not been treated fairly.

According to him, many pensioners, after two to three years are unable to access their pension while some are paid 50 per cent and 25 per cent lump sum.

The APC said that it was sad that many civil servants who had served the government for 35 years were being subjected to untold hardship after retirement due to delay and poor payment.

Mr Oyintiloye, who commended Mr Tinubu for approving N758 billion bond in February to clear 16 years pension liabilities, said that more needed to be done to save pensioners from untold hardships after retirement.

He urged the President to work with the National Assembly to review the 2004 Pensions Reform Act to enable pensioners to withdraw their retirement savings immediately after exiting the public service.

Mr Oyintiloye said that such a step would enable them to cater for themselves, venture into any business of their choice rather than living on 25 per cent lump sum of their savings and the monthly peanut.

He said that the life pensioners were living after retirement due to poor pay and delay could destroy the morale of those still in service and the coming generations.

APC

APC

He stated, “I want to appeal to the President to look into the plights of pensioners under the contributory scheme. The 2004 Pension Act needs reviewing to enable pensioners to lead a decent life after retirement.

Due to poverty and delay in payment, many retirees cannot afford a decent meal, good health care, good housing, among others after retirement. The intervention of the President will go a long way in bringing relief to retirees and hope for those who are still in active service. That is why I am pleading to the President to intervene.

He has shown that he is a leader with the capacity to solve problems. His intervention will go a long way in bringing relief to these people and hope for those who are still in active service.’’

Continue Reading

Economy

Governor Makinde Visits Burnt Aleshinloye Market, Halts Planned Demolition Of Affected Section

Published

on

By

Oyo Gov. Makinde Urges Muslims

Governor Makinde Visits Burnt Aleshinloye Market, Halts Planned Demolition Of Affected Section

Governor Makinde visits burnt Aleshinloye market, halts planned demolition of affected section. Mr Makinde said that his administration would restructure the market and ensure proper architecture to avert recurrence.

Oyo State Governor, Seyi Makinde, on Tuesday visited the Aleshinloye market, Ibadan, where a section got burnt on March 12.

Mr Makinde, while on-the-spot assessment of the incident, ordered suspension of the planned demolition of the burnt section until a proper alternative had been provided for the affected traders.

Recall that the fire outbreak occurred in the early hours of March 12, at the plastic and rubber section of the market, which destroyed goods worth millions of naira.

The governor made it known that his administration had provided some sort of palliatives to serve as immediate cushion for victims of the incident.

Oyo Gov. Makinde Urges Muslims

Oyo Gov. Makinde

He added that the state government, the Ibadan South-West Local Government Area and the Ibadan South Local Council Development Area would work on cushioning effect of the incident on traders in the next few days.

He, however, said that his administration would restructure the market, put in place a proper architecture that could avert future fire outbreaks.

“We have to enlighten the people. It is better to avoid anything that can lead to fire incident than to curtail it. So, the advocacy should be that people should store things, especially things with potential to get burnt with utmost caution,” he added.

Continue Reading

Akwa Ibom

Contractors, Skill Labourers Praise Governor Eno For Contract Boom In Akwa Ibom

Published

on

By

Skill Labourers Praise Governor Eno

Contractors, Skill Labourers Praise Governor Eno For Contract Boom In Akwa Ibom

Contractors, skill labourers praise governor Eno for contract boom in Akwa Ibom…we now struggle to find skill labourers says private contractors.

Pastor Umo Eno’s infrastructure development is creating a buzz in Akwa Ibom State, with workers praising the Governor for a contract boom across the 31 local government areas of the State

Since assuming office on May 29, 2023, Governor Eno’s administration has been focused on implementing the ARISE Agenda which envisions a vibrant, inclusive, diversified, and highly industrialized economy with lifelong opportunities for the improvement of social welfare conditions and broadly-shared prosperity.

Some skilled labourers in Uyo who spoke with journalists yesterday, praised Governor Eno’s administration for its commitment to infrastructural development which has led to a surge in projects across the state.

Narrating the dividends of the Governor’s infrastructural revolution in the state, Aniefiok Udoh, a skilled carpenter working at the site of the ongoing Ewet luxury estate in Uyo, said:

“Governor Eno’s administration has been a blessing to us. Before now, we used to stand at the labour market along four lanes without jobs, but since Governor Eno assumed office, we now move from one site to the other. We have never had it so good. The numerous construction projects have provided us with good paying jobs and steady income”.

Also speaking, Enobong Johnson, a skilled mason recounted his gains: “private contractors used to pay us between three and four thousand naira per day, but since we started working with Government contractors, we smile home with at least eight thousand naira every day. May God bless our dear Governor.”

Meanwhile, facts-finding tours to some construction sites within Uyo metropolis revealed that over 500 skilled labourers are currently engaged by Western Legacy, contractors handling the Ewet luxury garden while over 600 workers often spotted at the different departments of the ongoing Arise park handled by Buletin construction Nigeria Limited.

Similarly, over 1,000 skilled labourers were also spotted at the sites of the ongoing dualization project of Uyo village road, dualization of the new Ring road from Idoro road to Ibiono Ibom and at the Elderly Citizens center handled by Amitec Construction Limited, Hensek Integrated services and U & K Nigeria limited, respectively.

On the flip side of this development, the contract boom has also had an unintended consequence on non-government contractors who are now struggling to find skilled labourers.

Skill Labourers Praise Governor Eno

Skill Labourers Praise Governor Eno

“Many of our skilled labourers have been lured away by government contracts.” Said Mr Ekpo, the MD of build box Nigeria, a private contractor.

“Government contractors seem to pay skilled labourers higher hence, we are finding it difficult to complete our projects on time, because of the shortage of skilled workers,” he added.

Without equivocation, there is no local government area in Akwa Ibom State today, that does not have at least one major road construction ongoing in addition to either a model primary school or a primary health center.

From the Arise Compassionate homes targeted at each of the 368 wards of the state, to other strategic housing development and aviation hub expansion, Akwa Ibom State can best be described as a construction site with Akwa Ibomites gainfully engaged as core professionals, skilled workers and suppliers of one building material or the other.

The contract boom in Akwa Ibom is a testament to Governor Eno’s commitment to infrastructural development and job creation.

As the state continues to experience growth and development, skilled labourers remain appreciative of the opportunities provided by Governor Eno’s administration, with several other projects still lined up for flag-off in view.

Continue Reading

Trending